Sub-Process & Minimum Charge List
HVOF COATING coming soon! Watch for future updates.
Listed below are the minimum charges for the processes handled by
Embee Incorporated. Links are provided to our Prime Contractor Approvals for each process,
and to our facilities specifications.
Anodize | Prime Contractor Approvals| Facilities Specifications |
| |
Process |
Type |
Minimum Charge |
| • Chromic Anodize |
Type I |
$125.00 |
| • Chromic Anodize |
Type I Dyed |
$125.00 |
| • Sulfuric Anodize |
Type II |
$60.00 |
| • Sulfuric Anodize |
Type II Dyed |
$65.00 |
| • BAC 5019 |
|
$125.00 |
| • Hard Anodize |
|
$150.00 |
| • Hard Anodize with Teflon Seal |
|
$200.00 |
| • Alodine |
Chem Film |
$75.00 |
|
|
Cadmium Plating | Prime
Contractor Approvals | Facilities Specifications|
| |
Process |
Type |
Minimum Charge |
| • Cadmium |
Type I & Type II |
$120.00 |
| • Cadmium |
Type III |
$130.00 |
| • Titanium Cadmium |
|
$175.00 |
| • L.H.E. |
Low Embrittlement |
$130.00 |
| • DPS 9.28 L.H.E. Cadmium |
|
$130.00 |
| • PS 13144 L.H.E. Cadmium |
|
$130.00 |
| • Vacuum Cadmium |
|
$120.00 |
| • Brush Cadmium |
|
$230.00 |
|
|
Chrome Plating | Prime
Contractor Approvals | Facilities Specifications|
| |
Process |
Minimum Charge |
| • Hard Chrome |
$175.00 |
| • Thin Dense Chrome |
$215.00 |
|
|
Ion Vapor Deposited Aluminum (I.V.D.)| Prime Contractor Approvals | Facilities Specifications |
| |
Process |
Minimum Charge |
| • I.V.D. - Barrel |
$150.00 |
| • I.V.D. - Rack |
$250.00 |
|
|
Grinding (CNC - Conventional) | Prime Contractor Approvals | Facilities
Specifications |
| |
Please Contact Our Sales Dept. for Pricing |
|
| |
Process |
Minimum Charge |
| • I.D.* |
Based on time |
| • O.D* |
Based on time |
| • Surface* |
Basde on time |
| • Centerless* |
Based on time |
| • Hone* |
Based on time |
|
|
Nickel Plating | Prime
Contractor Approvals | Facilities Specifications|
| |
Process |
Minimum Charge |
| • Bright or Dull |
$130.00 |
| • Electroless Nickel |
$150.00 |
| • Nickel - Tin |
$290.00 |
| • Sulfamate Nickel |
$320.00 |
| • Sulfamate Nickel Salvage |
$460.00 |
|
|
Embrittlement Relief | Facilities Specifications |
| |
Process |
Minimum Charge |
| • 3 Hours, 400 Degrees F. Max.* |
$35.00 |
| • 8 Hours, 400 Degrees F. Max* |
$40.00 |
| • 12 Hours, 400 Degrees F. Max* |
$50.00 |
| • 23 Hours, 400 Degrees F. Max* |
$60.00 |
|
|
Painting | Prime Contractor
Approvals | Facilities Specifications |
| |
Prices do not include cost of paint |
|
| |
Process |
Type |
Minimum Charge |
| • Prime |
|
$160.00 |
| • Prime and Top Coat |
|
$185.00 |
| • Teflon Coat |
Teflon S |
$230.00 |
| • Solid Film Lube |
|
$150.00 |
| • Lube |
Electro Film |
$150.00 |
| • Corrosion Preventive Compound |
|
$100.00 |
| • Hot Oil |
|
$125.00 |
| • Powder Coating |
|
$100.00 |
|
|
Phosphate Coating | Prime Contractor Approvals | Facilities Specifications |
| |
Process |
Minimum Charge |
| • Manganese Phosphate# |
$120.00 |
| • Zinc Phosphate# |
$150.00 |
|
|
Shot Peen | Prime Contractor
Approvals |
| |
Process |
Minimum Charge |
| • Steel Shot* |
$85.00 |
| • Glass Shot* |
$85.00 |
|
|
Miscellaneous
| |
Process |
Type |
Minimum Charge |
| • Oxide Blast |
|
$60.00 |
| • Glass Bead Blast |
|
$60.00 |
| • Black Oxide# |
|
$120.00 |
| • Passivate# |
|
$45.00 |
| • Clean |
|
$45.00 |
| • Silver |
|
$200.00 |
| • Tin |
|
$100.00 |
| • Copper |
|
$200.00 |
| • Oil |
|
$40.00 |
| • Degrease |
Liquid |
$50.00 |
| • Pickle |
|
$50.00 |
| • Etch |
|
$50.00 |
| • Identify |
|
$50.00 |
| • Stress Relieve |
3 Hours |
$60.00 |
| • Source Inspection* |
Per Visit |
$75.00/Hr to $100.00/Hr |
| • G.S.I. Inspection* |
Per Visit |
$75.00/Hr to $100.00/Hr |
|
|
Non-Destructive Testing
| |
Process |
Minimum Charge |
| • Magnetic Inspection |
$50.00 |
| • Pre-Penetrant Clean |
$45.00 |
| • Penetrant Inspection |
$50.00 |
| • Technique for MPI |
$45.00 |
| • Nital Etch |
$90.00 |
| • Rockwell |
$45.00 |
| • Conductivity |
$45.00 |
| • Copper Sulfate Test* |
$25.00 |
| • Salt Spray Test* |
$35.00 |
| • Water Immersion Test* |
$35.00 |
| • Salt Spray* |
$35.00 |
|
|
Note: All prices shown are in U.S. Dollars.
| |
Processes with this symbol |
|
| |
* will be charged at the full minimum charge. |
|
| |
# indicates that testing is not included. |
|
Multiple processes are charged as follows:
Highest Minimum plus 1/2 each additional minimum.
Stripping Charges are the same as the minimum process charges.
Overhaul or Salvage work is not covered by this list.